Ghana SNA Archive

Road odenance

SNA-106 Case 121/09 28 Jan 1909 – 23 Jul 1909

Scanned page 55 of SNA-106: Road odenance
Scan PTDC0055.JPG · open full size

Transcription

Mr.Wolley, Assistant Surveyor of Roads, report under date May 12th, 1911, that the road right through is much grown up with weeds-the worst part being in the neighbourhood of Asuboa. though the road through the village itself is quite clean and free from weeds. He proceeds as follows:-

"I have seen what chiefs I could & have left instructions where I could not, that the trees are to be cleared off the road.

A 20' temporary bridge has been competely washed away 4 miles Nof Asuboa. I think it would be useless to put another temporary bridge here as there is a great rush of water at present & it would probably meet the same fate as the last.

Several small culverts needs repairing. One 2 miles N of Asuboa, one 3 miles N of Asuboa, one 4 miles & one 5 miles N. of asuaboa all need repairing."

Mr. Fletcher, Inspector of Works, travelled along the road on 13/6/11, and reports that, expect where the maintainance gang has been working, there is only a naroow bush track through high weeds, though the formation is good-Also, that all the bridges have been washed away and a large nubmer of the culverts.

Typed from the scan. Spellings follow the original and may contain mistakes.