Ghana SNA Archive

Untitled case file

SNA-37 Case 26/09

Scanned page 31 of SNA-37: Untitled case file
Scan PTDC0031.JPG · open full size

Transcription

a good bridge. first suitable trees of hard wood must be chosen as near as possible; then after these are cut down the lenth required are cut out, and rolled and to the cjosen site for the bridge -this is suhene the hard work comes in and it usually taken a day to get theselarge tree. The planting of the bridge etc is easy work.

4.Mr. Lloyd inform me that he intended making similar bridge throughout his district, which will geatly facilitate transport to and from this district. I may add that we are continuing making bridge where necessary, and that travelling here is much essier than formerly.

I have the honour to be,

Sir,

Your obedient Servant

(signature) Hobbs.

d.c.

To,

The secretary

for native affairs,

accra

Typed from the scan. Spellings follow the original and may contain mistakes.