Untitled case file
Transcription
Case No-40/09.
S.N.A
Seen
2.But the bridge be built further, at a cost of £ 120. if possible by Konor Mate koba
(signature) 14.6.10.
D.W.P.
H.E.'s minute of 14.6.10 for his information will you please communication this decision to W. Packwood ___I will inform the Ag. CEP who will __of the Konor can undertake the construction according of your plan.
(signature) 14.6.10
S.N.A.
I did, and the foreman of roads instructed accordingly (signature) ag D.W.P.
15.6.10
F.D. to C.E.P. including __copies 16.6.10
Faired ar/17.6.010
Despatched ar/17.6.10
B.U. 10.7 for reply
(signature) 20.6.10
Typed from the scan. Spellings follow the original and may contain mistakes.