Ghana SNA Archive

Untitled case file

SNA-49 Case 5158/99

Scanned page 20 of SNA-49: Untitled case file
Scan PTDC0018.JPG · open full size

Transcription

Adda

12 August 09.

C.E.P.

No. 417/122/06

Sir,

In reply to your letter No. S.N.A. Case 40/09 dated 5th July 09. reconstruction of a land over Okvesi Sheave I have the honour to inform you that I have just returned from adumasi and while there Konor Mate Kole placed the accompanying letter in my hands

Ninty pound (£90) seems a lays sum to be expended, but I understand that very substitutial foundation will be required The bridge over the same stream, on Messr. Somanya wad, through on concrete foundation, was recently worked away.

I have just banned form correspondance in this office that D.C. Akuse was instructed to inform Konor Mate Kolo that he would be allowed are amounted of £ 40. This was in May cost, but if so informed, the Konor made no mention of the fact in his conversation with me, and, the case not having been previous bought to my notice I had no papers with me.

Might no the D.J.W. Akase, be called upon to make as estimate?

I have the honour to be.

Sir,

Your obedient Servant.

(signature)

Ag.CEP

The Acting

Secretary for Native Affairs.

Accra

Typed from the scan. Spellings follow the original and may contain mistakes.