Road odenance
Transcription
-3-
however is being done very slowly and I consider it a mistake for the P.W.D. to do Road work in this District If Iam allocated the sum voted for the portion in this district Ibelieve Icould get it done
quicker. At preaent it is blocked and impassable near Kibbi and the P.W.D. has apparently left it remain so.10. Road No 8 This road has been constructed and all stream bridged in a very creditable way, by the natives of Apedwa.
I have etc:
(sgd) H.J. Hobbs
D.C. Birrim
To the C.E.P.
Akuse.
Typed from the scan. Spellings follow the original and may contain mistakes.